Skip to main content
Creating a Kit in the Item Catalog for Commercial Clean

For Commercial Clean, learn how to create kits to streamline your estimating!

Aspire Software avatar
Written by Aspire Software
Updated over 8 months ago

Table of Contents


Purpose

In this article, we will talk specifically about Kits, which are one of 6 item types you are able to use during the estimating process in Aspire.

Kits refer to bundled sets of related items, along with takeoffs, designed for specific services your organization performs. They then produce estimated labor hours or quantity of items based on your takeoff values.

While kits are an item type, they often group other item types like material or labor.

Some examples of kits for commercial cleaning organizations are:

General Janitorial Cleaning Kits: Utilize production factors for how long it will take to clean various volumes and sizes of specific surfaces.

Kits Requiring Materials and/or Equipment: Estimate this type of kit for work that requires not only labor, but also materials, chemicals, or equipment.

🧠 Some Kit item examples include: Dust Mop, Spot Clean Vertical Surfaces, Vacuuming Carpeted Stairs, Shampooing Carpet, and more!

Why Should I Use Kits?

Kits can be important to include in an item catalog for several reasons. They are convenient and save time. Kits provide a convenient, one-stop solution for your team by bundling together all the necessary items required for a specific task or project.

By offering pre-packaged kits, you can make sure that customers receive a complete set of compatible products designed to work together seamlessly. This eliminates the guesswork and potential compatibility issues for estimators.

Kits can be used as promotional or marketing tools, offering bundled products at a discounted price. This can attract new customers and encourage repeat business!

When Should I Wait on Using Kits?

🧠 If you do not know your production rates or if you haven’t finalized creation of your other item types, consider waiting to create your kits.

Remember, using kits is not mandatory, so give yourself time to enter your other items and their costs, as well as your production rates. Once you have those finished, you can proceed with making your kits.


Requirements

✅In order to add Kits to the Item Catalog, you must have System Admin or Branch Admin permission.

✅If you have Branch Admin permission, you also need Enhanced Admin Branch Security added to your user role.


Creating a Kit in the Item Catalog

Before kits can be used on estimates, they must first be created in the item catalog. The item catalog is located in the Estimating tab of Administration and serves as a record of current or past items that have been created for estimating services.

When it comes to organization, your item catalog structures items logically, making it easy to find what you need when estimating. By adding items to your catalog, you can promote consistent pricing across estimates!

  • Go to your Profile Icon. Click Administration.

  • Next, click the Estimating tab. Then, select Item Catalog.

  • The Item Catalog will appear showing your already created items! To create a new Kit, click New in the upper right then click New Kit.

  • The New Kit screen will appear. You can begin to add your Kit details to get closer to adding it to the Item Catalog!

  • Type in the kit’s Item Name.

    • This will be the name that is displayed on your customer’s proposal.

  • The Alternate Name can be the same as the item name, left blank, or updated.

    • You can edit the alternate name to be a specific name of a product or action as needed.

    • Alternate Name appears in the Item Catalog Search List, when searching in the Purchasing Assistant, is available for use on Purchase Receipt layouts or on estimate sheet layouts.

  • Select the Category that the Kit should belong to.

    • Item categories can include: Kit, Chemicals, Labor, Materials, etc.

      • Item categories can be set up in Lists in Administration.

  • Assign a Unit Type. The unit type of the kit relates to how the takeoff that will be used is measured. Typically, the Unit Type should match the Takeoff Item unit of measurement.

  • Assign a Takeoff Item if needed. Takeoff Items are often assigned to kits being used in Contract Opportunities but are not required.

    • Kits for Work Orders will have takeoffs entered at the opportunity level.

  • By default, new Items will be available for all branches. A branch can be assigned if the kit should be limited to specific branches.

  • Checking the Available to bid checkbox will make sure the kit can be used when estimating a service that contains the kit.

  • If needed, check the Force Single Unit Pricing checkbox.

    • Single Unit Pricing calculates the unit price and then multiplies it to determine the total price.

    • This method results in a slightly increased price, but provides consistent unit prices on a single work order.

📑This is most commonly used other industries, such as landscaping with planting material kits. However, this could be applicable in commercial cleaning, such as when you require the same unit pricing for post-construction clean-up in new build communities. For more info on Single Unit Pricing, click here.

  • The Description field provides a more complete description of the item.

    • This note becomes available when the kit is placed onto a service in the estimate.

      • Add a description here if you need item notes to appear on services in your opportunity estimate.

🧠You can also choose to include the item description in a proposal layout to give extra information to your customer.


Kit Examples

⚠️ The factors used below are for example purposes only and may not be how your company performs work.

Mopping with No Equipment

It's common to create kits based on what material or equipment you may or may not be using. After all, using motorized equipment will allow you to damp mop more flooring surface in a shorter amount of time than mopping by hand. Therefore, using equipment will have a different production rate than by hand.

The example below shows what a kit may look like if you are not using any motorized equipment.

Mopping with Equipment

When building kits, you will want to not only add labor items but also the material items needed to do the service. The example below shows what a kit may look like if you are using material and equipment parts in addition to labor to cover chemical and replaceable part costs.


Adding Items to a Kit

After the fields for your Kit are entered, you can assign items to your kit by using the drop down under Item Name. You can add these items to your kit here!

📌 Note: The items used for a kit must be created first before the kit itself. To learn about creating item types besides kits, click here.

We will break down the values and fields found in the item list for your kit below!

  • Item Name is assigned from the catalog item selected.

  • Item Type is assigned from the catalog item selected.

🧠 For Factors, Units, and Inverting, read the section after this to better understand what to put in these fields. Or, you can skip to the section here.

  • Enter your Factor, or Production Factor, for each item assigned to the kit.

  • The Units displayed are the Unit Type of the item added and the Unit Type assigned to the kit.

  • Selecting Invert will flip the Unit Types. This often makes it easier to enter factors so you don't need to figure out fractions! You can use whole numbers.

  • The Waste field allows a waste percent for the item. This is not as common for commercial clean opportunities.

    • Example: In several industries, such as landscaping (i.e., hardscape installation), you may need to factor in waste when you are working with non-bulk materials. . An example is that brick pavers are estimated based upon the square footage of the patio. However, because of cuts needed, it has been determined that there will be 10% waste from those cuts. This factor will allow for that waste when estimating and purchasing.

  • Unit Cost is assigned from the catalog item selected.

  • Extended Cost is calculated using Unit Cost and Factors.

Once all the information is entered, click Save to create your Kit!


Factors, Units, and Inverting

💡 When creating a kit, it's important to understand the relationship between the Factor, Units, and Inverting. Let's look at a kit with a production rate for our team to damp mop a hard surface floor.

​We'll read our Factor and Units from left to right. The kit is set up to say it takes .00023810 Hours for every 1 SqFt of floor that is damp mopped. As you can see, our Units column shows Hr / SqFt.

If we use SqFt as our production factor, we can use the Invert button to flip our unit types. This means we have now switched from Hr / SqFt to SqFt / Hr. The kit now reads we can damp mop 4,200 SqFt of flooring surface per 1 Hour.


Using a Kit in an Opportunity

Using the previous examples, we can see what the kit will look like when estimating.

When adding items to services in our estimate kits can be searched for by name and will be identified as kit on the left hand side.

When selected, the unit type assigned to the kit can be displayed and our qty entered. Using the previous example, entering 4,200 SqFt will estimate 1 labor hour.

Changing the quantity based on the takeoff we've performed, or what we've measured at the site, changes our labor hours to reflect the new quantity (2.2 hours).

Did this answer your question?